Qalaba Meydani multi-level tunnelled road junction
The Qalaba Square multi-level tunnel junction project around Ganjlik metro station includes 6 tunnel junctions with 5 traffic lanes. The total length of the tunnel is 2512 meters, width is 8-15.5 meters, height is 5.5 meters. This tunnel has been put into operation since February 2013.